Zaozhuang
BRT, updated
20-Oct-2010
Links
ITDP-China
ChinaBRT.org - Bus Rapid Transit
transportPhoto.net - Photos
publicBike.net - Bike Sharing
gzWalk.net - Walking Tours
About Us
Contact Us
BRT systems
BRT photos
BRT maps
Quantitative parameters
Qualitative parameters
Guangzhou
Xiamen
Ahmedabad
Amsterdam
Bangkok
Beijing
Bogota
Brisbane
Changzhou
Chongqing
Curitiba
Dalian
Guangzhou
Guayaquil
Hangzhou
Hefei
Istanbul
Jakarta
Jinan
Kunming
Lima
Mexico City
Nagoya
Nantes
Paris
Quito
Seoul
Urumqi
Utrecht
Xiamen
Yancheng
Zaozhuang
Zhengzhou
Amsterdam
Bangkok
Beijing
Bogota
Brisbane
Changzhou
Chongqing
Curitiba
Dalian
Guangzhou
Guayaquil
Hangzhou
Hefei
Istanbul
Jakarta
Jinan
Kunming
Lima
Mexico City
Nagoya
Nantes
Paris
Quito
Seoul
Urumqi
Utrecht
Xiamen
Yancheng
Zaozhuang
Zhengzhou
Ahmedabad
Amsterdam
Bangkok
Beijing
Bogota
Brisbane
Changzhou
Chongqing
Curitiba
Dalian
Guangzhou
Guayaquil
Hangzhou
Hefei
Istanbul
Jakarta
Jinan
Kunming
Lima
Mexico City
Nagoya
Nantes
Paris
Quito
Seoul
Urumqi
Utrecht
Xiamen
Yancheng
Zaozhuang
Zhengzhou
Peak throughput (passengers/hr/direction)
City centre peak hour speed (km/hr)
BRT system coverage (km) (1 fare)
Peak city centre buses/hr/direction
Average bus occupancy (peak hour & direction & point)
Operational mode
System passenger-trips per day
Location of busway lanes
Stations with functioning passing lanes (%)
Year system commenced
Fleet of special BRT buses
Fleet of integrated BRT feeder buses
Total length of dedicated busway (km)
Length including mixed traffic portions (km)
Number of stations
Average distance between stations (m)
Routes operating both inside & outside BRT roads
Routes operating only in busway corridors
Highest peak hour boardings at a single station
Highest full-day boardings at a single station
Station platform height (cm)
Location of bus doorways
Number of BRT terminals
Number of BRT depots
Median cash fare (yuan)
Median smart card fare (yuan)
Total planning and design costs (million yuan)
Infrastructure cost per km (million yuan)
BRT bus operator(s)
BRT bus cost - public funds (million yuan)
Number of doors in BRT buses
BRT vehicle length
No. of seats in 12m BRT buses
No. of seats in 18m BRT buses
BRT vehicle fuel
BRT bus manufacturer
Lead local design / planning work
Lead international design / planning work
Project website
BRT management agency
Segregated busways or bus-only roadways
Network of routes and corridors
Enhanced station environment (more than just a bus shelter)
High peak period operational speed (>20km/hr)
Buses operating both inside and outside the busway corridor
Majority of bus passengers in corridors carried by BRT buses
Net time saving for bus passengers in corridor
Overtaking lanes at more than half of all stations
Actual peak ridership >10,000 passengers per hr per direction
Actual peak ridership >20,000 passengers per hr per direction
Carries more people than a mixed traffic lane (~3000 pphpd)
Pre-board fare collection and fare verification
Distinctive BRT buses
Distinctive marketing identity for system
Distinctive BRT stations
Multiple stopping areas / substops
Includes BRT-only tunnels or bridges
More than one stopping position at each stop or substop
Sliding doors in BRT stations
Stations away from intersections
More than one BRT bus operator
Competitively bid operating contracts and concessions
Payment per bus-kilometre rather than per passenger
No operational subsidy from government
BRT buses paid for by operators rather than government
Independently operated and managed fare collection system
Quality control oversight from an independent entity/agency
Low-emission vehicle technology (Euro III or higher)
Automated fare collection and fare verification system
Station size based on passenger demand
Full weather protection on all station platforms
System control centre
Real-time next bus information displays
Signal priority or grade separation at intersections
At-level boarding and alighting
High capacity BRT buses
High-quality passenger information at stations
High-quality passenger information on buses
Audio announcements on BRT buses
Bicycle parking at BRT stations
Segregated bike lanes along main corridor(s)
Bike sharing in vicinity of BRT stations
Wheelchair accessible stations
BRT authority responsible for planning & control of the system
Zaozhuang
BRT
Segregated busways or bus-only roadways
Network of routes and corridors
Enhanced station environment (more than just a bus shelter)
High peak period operational speed (>20km/hr)
Buses operating both inside and outside the busway corridor
Majority of bus passengers in corridors carried by BRT buses
Net time saving for bus passengers in corridor
Overtaking lanes at more than half of all stations
Actual peak ridership >10,000 passengers per hr per direction
Actual peak ridership >20,000 passengers per hr per direction
Carries more people than a mixed traffic lane (~3000 pphpd)
Pre-board fare collection and fare veri?cation
10 stations with pre-board fare collection, 14 stations without
Distinctive BRT buses
Distinctive marketing identity for system
Zaozhuang BRT
Includes BRT-only tunnels or bridges
Sliding doors in BRT stations
10 stations with sliding doors, 14 without
Stations away from intersections
More than one BRT bus operator
Competitively bid operating contracts and concessions
Payment per bus-kilometre rather than per passenger
No operational subsidy from government
subsidy needed
BRT buses paid for by operators rather than government
Low-emission vehicle technology (Euro III or higher)
Buses yes, but fuel?
Station size based on passenger demand
Full weather protection on all station platforms
System control centre
Real-time next bus information displays
Signal priority or grade separation at intersections
At-level boarding and alighting
level but sometimes large gap
High capacity BRT buses
High-quality passenger information at stations
High-quality passenger information on buses
Bicycle parking at BRT stations
Segregated bike lanes along main corridor(s)
Mostly
Bike sharing in vicinity of BRT stations
Wheelchair accessible stations
Peak throughput (passengers/hr/direction)
:
700
Railway station, west-east, PM peak, 8-Oct-2010
City centre peak hour speed (km/hr)
:
30
AM peak, east-west, 9-Oct-2010
Peak city centre buses/hr/direction
:
27
Average bus occupancy (peak hour & direction & point)
:
26
Location of busway lanes
:
Centre of roadway; kerbside
Stations with functioning passing lanes (%)
:
0
Most station substops
:
1
Year system commenced
:
2010
Opened 1 August (1 Sept paid operation)
Total length of dedicated busway (km)
:
33
Length including mixed traffic portions (km)
:
33
Number of stations
:
24
Average distance between stations (m)
:
1,400
Number of corridors
:
1
Routes operating both inside & outside BRT roads
:
6
B1, Z1, Z2, H1, H2, H3
Routes operating only in busway corridors
:
1
Fare type (flat, zonal, distance-based, other)
:
flat fare
Location of bus doorways
:
Right side
traffic is on the right
Number of BRT terminals
:
2
Number of BRT depots
:
1
Median cash fare (yuan)
:
2
Median smart card fare (yuan)
:
1.8
1 yuan for students
Number of doors in BRT buses
:
3
2 in the 18m buses, 2 in the 12m buses
BRT vehicle length
:
12m, 18m
BRT vehicle fuel
:
diesel
BRT bus manufacturer
:
Kinglong and Yutong
Kinglong is based in Xiamen, Yutong is based in Zhengzhou
BRT management agency
:
Zaozhuang Public Transport Co.